Miller Construction

Parcelforce Distribution Centre - Chorley

site view

Package details
      
Substructures – Foundation bases for columns, preparation of sub-base, drainage.
External Works – Drainage, preparation of sub base retaining structures, drainage, BWIC.

Completion: February 2013


Kendal Riverside

Kendal Shopping & Apartment Complex

A mixed use retail, commercial and residential scheme in the heart of Kendal.

Within the building demise, Kiernan constructed the insitu perimeter ring beams, waterproofing to ground floors, concrete ground and upper floors including lift and stair risers and a paved roof terrace.

Externally Kiernan completed the foul and storm drainage, including outfalls into both the highway and the adjacent river. In addition Kiernan installed all external service trenches and finished off with high specification stone and reconstituted paving.


Bolton Market Regeneration

Bolton Market

Demolitions & Concrete Structures

Kiernan completed the internal demolition of a indoor victorian market area for conversion into new modern shopping centre, retaining the key features of the existing structure.

Works consisted of demolition of market stalls and surrounding shops. Specialist demolition of vaulted arches, including provision of new lift pits and stair cores through arches. New works also included renovation and installation of new drainage, new slabs and screed works


Stamford Shopping Centre Phase 1

Demolition of existing shop units, link bridges and rooftop car park, foundations, ground beams, ground slabs and upper floor slabs.